Projects

Some of our more recent projects:

Santos

11 Klm In-situ stabilisation prior to seal

Polytan STI

Sub-grade stabilisation for artificial turf football pitch

Queensland Gas

14 Klm roads plus hard stands and car parks – initial stabilisation and dust control at Windibri Gas Plant (134,000m²)

Brisbane Airport Corporation

Airport upgrade pre load – dust control

Minerva Mine

Stabilisation and upgrade of Northern and Southern haul roads and workshop areas (210,000m²)

Origin Energy

Stabilisation of sub-grade (reactive clay) to strengthen and cap against weather and traffic damage – Talinga Gas Plant (610,000m²)

Origin Energy

Stabilisation of sub-grade (silty clay), access roads and construction area for RO pad and ponds (120,000m²)

Kestrel Coal

Stabilisation and dust control of all surface roads (66,000m²)

Jellinbah Mine

Upgrade existing haul roads utilising deep compaction techniques and wear course stabilisation (135,000m²)

Yarrabee Coal

Upgrade main road train haul road (13.6 Kilometres) Stabilise and strengthen shoulders utilising in-situ material (40,800m²)

Crinum Mine

Stabilise main equipment lay down area and workshop area (32,000m²)

Thiess

Sub-grade stabilisation (strengthen and cap Permian clay material to prevent weather and traffic damage during works) (works in progress)

Some of our more recent clients:

  • Local Government all over Queensland
  • BMD Construction
  • Santos
  • Polytan STI
  • CMC Construction
  • Brisbane Airport Corporation
  • Minerva Mine
  • MIPAC
  • Origin Energy
  • Ostwald Bros Construction
  • Thiess
  • Kestrel Coal (Rio Tinto)
  • JMS mining
  • Mitchell Environmental Builders
  • New Acland mine
  • Unimin
  • Watpac Construction
  • Garwoods Mining & Construction
  • Forestry Queensland
  • Environmental Protection Agency
  • Yarrabee Coal
  • Main Roads Queensland
  • Parks and Wildlife (Queensland)
  • Queensland Gas Company
  • Crinum Mine (BMA)
  • Diversified Engineering
  • Jellinbah Coal
  • F.K. Gardner Construction